Phenna Project - Foundation and In Floor Heating

Click thumbnails for full image

Photo One:

After excavation, the footer was poured and the foundation and basement walls were poured on top of the footer.

Photo Two:

Garage walls are poured and the garage floor is now ready for concrete.

Photo Three:

Prep work and assembly of the in-floor / radiant heat system for basement level heat begins.

Photo Four:

The radiant heat pipe is installed and ready for the concrete floor to be poured.

Photo Five:

An additional view of the in-floor heat system.

Photo Six:

The concrete is poured and the basement floor is now complete and ready for framing to begin.



Phenna Project - Framing

Click thumbnails for full image

Photo One:

Westside elevation basement walls and main level walls are framed and sheeted.

Photo Two:

North-West elevation walls framed and sheeted.

Photo Three:

Garage and main entry view with sheeting complete and ready for the doors and windows to be installed.

Photo Four:

The North-East corner of the home, as seen from the top of the driveway. With the framing and siding now complete the roofing process can now begin.



Phenna Project - Siding

Click thumbnails for full image

Photo One:

Southside elevation with the galvanized corrugated siding completed and ready for basecoat stucco.

Photo Two:

North-West elevation with doors and windows installed and galvanized corrugated siding finished.

Photo Three:

An additional view of North-West elevation.

Photo Four:

Looking up at the westside elevation all the doors and windows have been installed, siding has been completed and stucco basecoat process will soon start.



Phenna Project - Stucco Basecoat and finish.

Click thumbnails for full image

Photo One:

Southside elevation, the grey stucco basecoat is applied to exterior in preparation for the final stucco coat and color.

Photo Two:

Westside elevation with completed stucco basecoat and siding completed.

Photo Three:

View of the North-West elevation with completed stucco basecoat.

Photo Four:

The final stucco color and finish start being applied.

Photo Five:

Garage and main entry view with finished stucco.

Photo Six:

South-West elevation with both siding and stucco complete.

Photo Seven:

Southside elevation.


Phenna Project - Main Level in floor heat.

Click thumbnails for full image

Photo One:

The entire main level is cleaned and prepped for the installation of the in-floor heat system.

Photo Two:

Kitchen and livingroom view with radiant heat pipe installed and ready for the concrete floor to be poured.

Photo Three:

View of the main entry.

e Photo Four:

In-floor heat system assembled in the mechanical room located in the basement.

Photo Five:

Additional view of heat system.

Photo Six:

Concrete floor being poured over in-floor heat system on the main level.



 